SHARE YOUR IDEAS

How can we make ARIS Process Mining better?

Calculate duration between given date and today's date

The automation (e.g. daily) for (re)calculation should include such use cases by default.

Maybe a dedicated timespan calculation so that no further configuration is required (maybe filter on status) aside from specifying the start date.

In addition, add a capability to exclude cases based on dimensions (status, last stage) in order to remove closed cases from an alert list.

  • Nicolas Ballarin
  • Jul 7 2021
  • Shipped
  • +4